2023 Roadworks

Before …..

Before roadworks, outside “Rowhills Cottage” and “The Rockery”
Broken road surface
Outside “The Rockery”

During and after roadworks …..

At the A325 end, outside “The Rockery” and “Rowhills Cottage”
As above. Old broken tarmac removed. Tidey and Webb were the contractors
Install concrete ramp
“concrete pad at “The Rockery” removed and relaid (at owner’s expense)
Outside Nytimber, potholes were filled.
Rolling Type 1 ballast.
Tidey and Webb at work. 20mm asphalt first, then 10mm on top.
Good progress outside “Rowhills Cottage”
Ramp now installed. Concrete edging is concreted down.
Potholes filled at no additional cost with spare asphalt.
Edges will be sealed the following day.